UPDATE COVID 19

Our thoughts and prays are going to the people affected by the COVID19

and all the people who dedicate their lives to caring for others.

Last update 05 June

During the lockdown, DP Lenticular was working normally but from home…  

Pacur was working non stop but mainly producing face shields. New lenticular productions were shipped to Europe from last week.

Warehouses:

Our partners in Ireland, Barcelona and Belgium were non-stop operational during the difficult lockdown times.

This means that we continued to keep the same stock level and we continued to deliver.

As you imagine transport is (like always) an important issue. As we remind regularly, please note that we cannot be responsible for any damage or unforeseen delays that may occur.

Across Europe lockdown measures are being lifted and transport is going back to normal, however still with reduced volumes. 

We are pleased to inform you that DSV is fully operational in Europe. The only exceptions are France, Sweden and Portugal.

France: no guarantees on groupage lead times.

Sweden: Stockholm area (ZIP codes 10-19 and 60-98) no guarantees on leadtimes.

Portugal: as from Monday 15/06 back to 2 departures per week (Tuesday and Friday).

EXW:

If you are organizing transport from our partner DSV warehouse, please make sure the forwarder is booking a slot as mentionned in the email we send you with the details.  Also we were informed that :

  • All warehouse employees will wear gloves.
  • Drivers receptions desk: disposal gloves are foreseen
  • Plexiglas is installed at driver desks to make the opening smaller
  • Truck drivers are having limited access in the sites.
  • A line is created on the floor in the reception desk to ‘garantee’ distance. Max 2 people inside the receptions waiting area, also with respect of the social distance.

 

-->
  • Archivos

  •  

    legomand_72_lpi Kiev Lavra Animation butterfly_lenticular_300px KIRAC CD cover Cameleon
Do NOT follow this link or you will be banned from the site!